Customization: | Available |
---|---|
After-sales Service: | Field Installation, Commissioning and Training |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Combining with German High-tech and Hongfa Technology, this advanced QT4-35 brick concrete making machine is superior to other block production machine in these aspects:
1.Passing the strict quality inspection
2.CE/SGS/ISO9001:2000
3.With the best configuration
4.Imported Control Panel
5.With great performances
6.Super strong vibration and can produce high density brick
7.Extremely proving the stability
8.Effectively to solve the problems of system halted, holdup, weak pressure, motors burning and consumption in the block machine industry.
Technical Parameter(Block Making Machine)
|
Detailed Data
|
||
Overall Dimension
|
2050×1660×1900(mm)
|
||
Rated Pressure
|
16MPa
|
||
Main Vibration Form
|
Platform Vibration
|
||
Cycle Time
|
35 seconds
|
||
Vibration
|
32KN
|
||
Vibrating Frequency
|
2800-4500 rolls/minute
|
||
Motors Power
|
9.7KW
|
||
Pallet Size
|
850*450(mm)
|
||
Weight
|
1300KG
|
Productivity of QTJ4-385B2 block making machine | ||||||
Samples | Size mm | Cycle molding |
QTY /Mould |
Per hour | Per 8hours | |
Hollow brick | 400*200*200 | 30-35S | 4 | 412-480 pcs | 3296-3840 pcs | |
Solid brick | 240*115*53 | 25-30s | 21 | 2520~3024pcs | 20160-24192pcs | |
Hollow brick with different size | 400*150*200 | 30~35s | 5 | 515~600pcs | 4120-4800pcs |
Packing: Naked packing or stretch film packing or according to customers' requirements(We will send machine with plastic film package,parts with wooden case,if need, fumigation wooden carton also available.)
Delivery time: Within 25 days after receipt of deposit and moulds confirmation from buyer(Flexible Delivery Way:FCL sailing or LCL sailing,Air Transportation,parts or document with express delivery.)
Q1. Are you manufacturer or trading company? |
We are Direct factory, not agent or trading company, and the quality and after-sale services is guaranteed. |
Q2. When do you delivery the goods? |
Normally 30 days after receipt of deposit and moulds confirmation from Buyer. |
Q3. What about the payment? |
30% as down deposit by T/T ,70% as the balance paid by T/T before loading(L/C is also acceptable). |
Q4. how can we guarantee quality? |
Always a pre-production sample before mass production; |
Always final Inspection before shipment; |